2023-013 West End Sidewalk Repairs, Project

The approximate principal materials and quantities are as follows: 4” Concrete Sidewalk – 750 SY, 6” Concrete Paving (Driveways) – 45 SY, 18”Concrerte Curb & Gutter – 130 LF, ADA Curb Ramps – 3 Each (all work will be within a couple of blocks of Hemphill Elementary School)
Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum1-Specs 449.2 KB