2023-013 West End Sidewalk Repairs, Project
The approximate principal materials and quantities are as follows: 4” Concrete Sidewalk – 750 SY, 6” Concrete Paving (Driveways) – 45 SY, 18”Concrerte Curb & Gutter – 130 LF, ADA Curb Ramps – 3 Each (all work will be within a couple of blocks of Hemphill Elementary School)
Plan Holders
Date | Company | Contact |
8/21/23 1:17 pm | BCIA Birmingham Construction Industry Authority
601 37th Street South Birmingham, AL 35222 | Ashley Orl Tel: (205) 324-6202 Fax: (205) 324-6210 |
8/29/23 9:33 am | C P Construction S-Corporation
905 24th St. SW Birmingham, AL 35211 | Barbara Williams Tel: (205) 515-0866 |
8/28/23 12:36 pm | Constructconnect
3825 Edwards Rd. Suite 800 Cincinnati, OH 45209 | Plan Acquisition Content Tel: (513) 458-5978 Fax: (513) 458-5978 |
9/11/23 8:51 am | Dodge Construction Network
2860 South State Highway 161 Suite 160 #501 Grand Prairie, TX 75052-7361 | Jayalakshmi L Other Tel: (413) 376-7032 Fax: (733) 553-6621 |
9/7/23 12:20 pm | Gillespie Construction, LLC
3304 3rd Ave S Jasper, AL 35501 | Erin Henson HR Manager Tel: (205) 295-5263 Fax: (205) 295-5363 |
9/5/23 11:46 am | Global Management Group
P.O. Box 19731 Birmingham, AL 35219 | Mary Rugano Tel: (205) 261-1163 |
8/24/23 1:55 pm | Southeastern Sealcoating
1330 Adamsville Industrial Parkway Birmingham, AL 35224 | David Henderson Tel: (205) 798-9560 Fax: (205) 798-9065 |