2023-013 West End Sidewalk Repairs, Project
The approximate principal materials and quantities are as follows: 4” Concrete Sidewalk – 750 SY, 6” Concrete Paving (Driveways) – 45 SY, 18”Concrerte Curb & Gutter – 130 LF, ADA Curb Ramps – 3 Each (all work will be within a couple of blocks of Hemphill Elementary School)
    
    
    
    
    
    
    
            
                                                DIGITAL DOWNLOAD Complete Set
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            ***** This section is for the purchase of Digital files. Once the order is received and verified a download link will be provided, in a separate email. Plans are located withiin the spec book*****
                
                
                                    | Name | Size | ||
| 0001-Curb Ramp Detail | 835.6 KB | ||
| 0002-Standard Sidewalk Details | 551.9 KB | ||
| 0003-Street Detail | 598.8 KB | ||
| Bid Document West End Sidewalk Repairs | 1.0 MB | 
                                                HARD COPY Complete Set
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            *****This section is for Complete HARDCOPY printing ONLY. Plans are located within the spec book*****
                
                
                                    | Name | Size | ||
| 0001-Curb Ramp Detail | 835.6 KB | ||
| 0002-Standard Sidewalk Details | 551.9 KB | ||
| 0003-Street Detail | 598.8 KB | ||
| Bid Document West End Sidewalk Repairs | 1.0 MB | 
 
    